Infor SyteLine is a great fit for many businesses. Find out if it's the right choice for you! Are you looking for a Infor SyteLine demo, technical support, product or pricing information or to simply to compare Infor SyteLine with competitive options? Quickly get answers and the information you need.

Infor ERP SyteLine supports the creation of Bills of Materials for manufactured parts. A Bill of Material (BOM) is the set of materials needed to complete each of the operations. The BOM can be multi-level, which means one of the materials required for operation xyz is a subassembly that has its own routing and BOM.

Changes to Bills of Materials are automatically captured at the time a Job is released. You can create a new BOM by copying it from another inventory item (which uses the current routing and BOM), another job, estimate job, or a production schedule item or release.

  • Create both the routing and Bill of Material on one screen using Engineering Workbench.
  • Copy bills of materials from jobs, items, estimates, or production schedules
  • Assign fixed and variable overhead rates to materials
  • Maintain reference information (bubble number, reference designator, assembly sequence)
  • Define alternate Bills of Materials
  • Set Items to back flush
  • Enter the percentage of scrap expected for use with planning or purchasing
  • Effectivity and obsolescence dates
  • Phantom Items
  • Where used

Routings

A routing is a group of steps which must be performed to assemble an item. This is typically a step within a Bill of Materials operation. Routings are used for planning, scheduling and costing.

  • Create both the routing and Bill of Material on one screen using Engineering Workbench.
  • Copy routings from jobs, items, estimates, or production schedules
  • Define your production standards — pieces/hour, hours/piece, fixed hours
  • Support of Outside Service routing steps
  • Capture move, queue, setup, and finish times
  • Assign fixed and variable overhead rates
  • Unlimited Notes to operations
  • Resource planning available

Engineering Change Notices (ECN)

Use the Infor ERP SyteLine Engineering Change Notices (ECN) form to control and track revisions made to a Bill of Material or to the routing of an item. The ECN process is crucial in ensuring high quality, safety, and consistency of products.

  • Approvals of changes before it can be used on Jobs or Estimates
  • Mass replace/delete
  • Enter a priority code to determine the order in which you want to implement the ECN
  • Maintain reason codes
  • Maintain distribution codes for who must be notified of the ECN change
  • Identify what needs to be changed
  • Copy ECN functionality
  • Revision Control
  • Track ECN and revision history
  • Maintain an audit trail of changes to the ECN record throughout the change process.
  • Reporting that will allow you to see the Jobs that are affected by ECNs
  • Maintain a comprehensive audit trail of changes to the Bill of Material and routings
  • Update part or document revision levels automatically upon incorporating changes.