Is Horizons Manufacturing Suite right for your business?

Horizons Manufacturing Suite is a great fit for many businesses. Find out if it's the right choice for you! Are you looking for a Horizons Manufacturing Suite demo, technical support, product or pricing information or to simply to compare Horizons Manufacturing Suite with competitive options? Quickly get answers and the information you need.

The Horizons Engineering Change Order module, available for both Dynamics GP Standard and Professional, allows the end user to effectively manage and track version level changes to Bills of Material and components, including item content changes, quantity changes and approved alternates.

The seamless integration of this module with the Horizons Manufacturing Suite (HMS) products and Microsoft Business Solutions Dynamics GP provides unparalleled control of change request events, Bill of Material changes and component level version control for small and mid-market manufacturers and distributors in fully or semi-regulated industries.

Organizations in life science, high tech engineering and other regulated industries such as food or medical device distribution will find that the ECO tools deep integration with the manufacturing process in production entry and both bill of material and item set up provides significant support for improved documentation and compliance control.

Use Helpful Processes & Process Management Tools

  • Identify designated approvers for all change actions
  • Define target effectivity dates for proposed changes
  • Provide easy access to historical revision information for production and customer support personnel
  • Identify existing material use-up methods
  • Perform mass updates for find and replace needs
  • Comment tracking on a per approver basis as the change request documents process through your work flow
  • Efficiently and accurately meet needs to build to existing or prior versions
  • Identify existing material and vendor disposition methods with approved codes

Gain Product Life Cycle Management Tools

  • Use version indexing to identify pre-production and released-to-production status
  • Enhance ease of use for communicating needs and specifications with document attachment and unlimited note fields
  • Support tracking historical events with change logs that have user identification and relevant dates in lookup windows and reports

Other Applications

The following applications are designed to work hand-in-hand with Engineering Change Order:

"Engineering Change Order" is part of the Horizons Manufacturing Suite line of products, developed by Horizons International.

Related Products

The following software product lines are also offered by Horizons International: